摘要 |
<p>PROBLEM TO BE SOLVED: To facilitate construction and renovation of a system in a large scale computing system constructed using an integral device.SOLUTION: A management computer for managing a system updates connection information between integral devices by referring to integral device internal structure information and introduction scheduled integral device structure information, and prepares a transition plan of a virtual computer on a computer and a storage area inside a storage device to be introduced on a computing system along with the virtual computer and the storage area to be removed from the computing system based on the connection information between integral devices. When the prepared transition plan contains a latency policy showing whether or not it is required to be acted, the transition plan for arranging the virtual computer and the storage area in the same integral device is output based on the latency policy.</p> |