发明名称 |
Flow control devices on expandable tubing run through production tubing and into open hole |
摘要 |
An example downhole completion system includes a first sealing structure arranged within an open hole section of a wellbore and being movable between a contracted configuration and an expanded configuration, a second sealing structure arranged axially adjacent the first sealing structure and also being movable between a contracted configuration and an expanded configuration, and a flow control device arranged between the first and second sealing structures and configured to provide a flow path for fluids to communicate between a surrounding subterranean formation and an interior of the downhole completion system. |
申请公布号 |
US8789581(B2) |
申请公布日期 |
2014.07.29 |
申请号 |
US201314049631 |
申请日期 |
2013.10.09 |
申请人 |
Halliburton Energy Services, Inc. |
发明人 |
Fripp Michael;Gano John;Besselink Peter;Van Moorleghem Wilfried |
分类号 |
E21B33/12;E21B43/10;E21B43/08;E21B33/124;E21B33/10;E21B43/12;E21B34/06;E21B33/13 |
主分类号 |
E21B33/12 |
代理机构 |
McDermott Will & Emery LLP |
代理人 |
McDermott Will & Emery LLP ;Wustenberg John W. |
主权项 |
1. A downhole completion system to be arranged within an open hole section of a wellbore, comprising:
a first sealing structure configured to be expanded from a contracted configuration to an expanded configuration; a second sealing structure configured to be expanded from a contracted configuration to an expanded configuration and arranged proximally from the first sealing structure; and a flow control device radially disposed between the first and second sealing structures and providing a flow path for fluids, wherein the flow control device defines one or more conduits extending through the flow control device, the one or more conduits providing at least a portion of the flow path for fluids to communicate between the surrounding subterranean formation and the interior of the first and second sealing structures. |
地址 |
Houston TX US |