摘要 |
PROBLEM TO BE SOLVED: To provide a method capable of discharging a large amount of drain important for an undersea power generation ship to open sea at a light discharge load.SOLUTION: By considering an installation method of a few to a several places in a discharge drain space part installed to an inside part, a large capacity of drain is enabled, and simultaneously a discharge method of both suction and negative pressure is proposed. |