发明名称 SIMULTANEOUS-SEPARATE OPERATION OF INJECTION WELL
摘要 FIELD: oil-and-gas industry.SUBSTANCE: proposed method comprises forcing working fluid via short pipe of string to top seam and working fluid via long pipe tubing equipped packer to bottom seam. Going-in of downhole instruments or inserted pipe via control head and long pipe string. Well is analysed by downhole surveying instruments. Technological jobs are performed with the help of inserted pipe. Downhole instruments are lowered in well via control head and long pipe string, forcing working agent via long pipe string is maintained under operating conditions while forcing via short pipe string is continued or terminated. In making technological jobs, inserted pipe is lowered in well via control head and long pipe string to stop forcing via long pipe string.EFFECT: geophysical survey or technological jobs with lifting pipe string.1 dwg
申请公布号 RU2524087(C1) 申请公布日期 2014.07.27
申请号 RU20130127390 申请日期 2013.06.17
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IM. V.D. SHASHINA 发明人 IBRAGIMOV NAIL' GABDULBARIEVICH;RAKHMANOV AJRAT RAFKATOVICH;ZAKIEV BULAT FLUSOVICH;MALIKOV MARAT MAZITOVICH;GALIEV MARSEL' RAMIL'EVICH
分类号 E21B43/14;E21B43/18 主分类号 E21B43/14
代理机构 代理人
主权项
地址