摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide construction device/method of a water bottom cable for reducing correction cost and shortening a correction period by preventing entanglement when a plurality of cables are constructed. <P>SOLUTION: The construction device 2 is pulled by a construction work ship 1 and constructs the plurality of cables 3a to 3c on a water bottom. The device includes a plurality of guide members 20 which are arranged by leaving a prescribed cable construction interval p and guide the respective cables 3a to 3c in a construction direction, a separation member 21 separating the respective cables 3a to 3c to go to each of the guide members 20, and a supporting member 22 supporting the guide members 20. <P>COPYRIGHT: (C)2012,JPO&INPIT</p> |