发明名称 System and method for testing power supplies of server
摘要 A computing system connects to a server that comprises a plurality of power supplies. The computing system sends a power on command to one or more alternating current (AC) relays which are connected to the power supplies. Each of the one or more AC relays powers on the corresponding power supply according to the power on command. The server starts if the all the power supplies are powered on. The computing system sends a power off command to each predefined AC relay to power off the power supply corresponding each predefined AC relay in sequence. An execution unit of the server tests application programs of the server when each power supply corresponding to the predefined AC relay has been powered off. A result of testing the server denotes if the server is abnormal when the power supply has been powered off.
申请公布号 US8788238(B2) 申请公布日期 2014.07.22
申请号 US201113221855 申请日期 2011.08.30
申请人 Hon Hai Precision Industry Co., Ltd. 发明人 Lin Jui-Ching
分类号 G06F1/16;G06F1/26 主分类号 G06F1/16
代理机构 Novak Druce Connolly Bove + Quigg LLP 代理人 Novak Druce Connolly Bove + Quigg LLP
主权项 1. A computing system, comprising: a storage system; at least one processor; and one or more programs being stored in the storage system and executable by the at least one processor, the one or more programs comprising: a sending module operable to send a power on command to one or more alternating current (AC) relays connected to the computing system, to power on a power supply of a server connected to each of the one or more AC relays, and send a power off command to a predefined power supply of the server if the server is booted; the sending module further operable to send a test command to the server to test the server that is powered by remaining power supplies which are not powered off; a detection module operable to detect whether a test time of testing the server has reached a predefined time; a receiving module operable to receive a test result from the server when the test time of testing the server has reached the predefined time, the test result according to a determination of whether the server works normally; the detection module further operable to detect whether the server fails the test according to the test result; the receiving module further operable to power off the server if all the power supplies are powered off and the server is determined as passing the test; and a determining module operable to store the test result in the storage system if the server fails the test.
地址 New Taipei TW