摘要 |
PROBLEM TO BE SOLVED: To provide a circulating fluidized bed boiler which is easy in installation.SOLUTION: In a circulating fluidized bed boiler 100, legs 30, 40 and 50 extending to an installation face GD are arranged at a plurality of main units 10A, 10B and 10C, respectively. Furthermore, the plurality of man units 10A, 10B and 10C can stand in a self-supported manner on the installation face GD by being supported by the legs 30, 40 and 50. By such a constitution, a process for installing a steel frame 250 or the like prior to an installation place can be eliminated. Accordingly, work for installing the legs 30, 40 and 50 to the respective main units 10A, 10B and 10C is easily performed in a short period of time, and thereby the installation is easily performed. This can shorten a construction period for installing the circulating fluidized bed boiler 100. |