摘要 |
PROBLEM TO BE SOLVED: To prevent a column from coming off from a bedsill by a seismic force or prevent a beam from being pulled up from the top of the column, by applying a force, which resists vertical pulling, between upper and lower horizontal members, and to achieve earthquake resistance by reinforcing a connection part.SOLUTION: In a wooden building, a brace is provided in a space section that is formed of a beam 5, a bedsill 3 and a column 4. A metal fitting 10 for joining the beam 5 and the column 4 together, and a metal fitting 20 for joining the column 4 and the bedsill 3 together are provided among the beam 5, the column 4 under the beam 5 and the bedsill 3 under the column, and the metal fittings 10 and 20 are connected together by an intermediate metal fitting 17. The respective metal fittings 10, 17 and 20 are arranged on a surface, on the other side of the brace 7, of the column 4. |