摘要 |
A method for torsional wave logging in a borehole of a subterranean formation. The method includes obtaining a torsional wave measurement of the borehole, wherein the torsional wave measurement represents characteristics of a torsional wave propagating within a cylindrical layered structure associated with the borehole, wherein the cylindrical layered structure comprises the subterranean formation and a completion of the borehole, analyzing, by a computer processor, the torsional wave measurement to generate a quality measure of the completion, and displaying the quality measure of the completion. |
申请人 |
SCHLUMBERGER CANADA LIMITED;SERVICES PETROLIERS SCHLUMBERGER;SCHLUMBERGER HOLDINGS LIMITED;SCHLUMBERGER TECHNOLOGY B.V.;PRAD RESEARCH AND DEVELOPMENT LIMITED;SCHLUMBERGER TECHNOLOGY CORPORATION |
发明人 |
SINHA, BIKASH K.;BOSE, SANDIP;YANG, JIAQI;LEI, TING;HABASHY, TAREK M.;ZEROUG, SMAINE;LUO, MA |