发明名称 METHOD OF INSTALLING ROUND TIMBER INTO GROUND TO TAKE LIQUEFACTION-CONTROL MEASURES AND PRECEDENT EXCAVATION ROD
摘要 PROBLEM TO BE SOLVED: To provide a precedent excavation rod capable of excavating an excavation hole into which round timber is inserted, without soil removal, so as to compact the ground, and a method of installing round timber into ground to take liquefaction-control measures by which the ground can be easily made dense and solid by using round timber.SOLUTION: The precedent excavation rod is configured to compact the ground around an excavation hole while forming the excavation hole on the ground before inserting round timber into the ground. The precedent excavation rod comprises: a mounting part connected to a drive head of a pile driver; a tapered rod part of which the diameter is reduced in an excavation direction; a tapered pencil part of which the diameter is further reduced in the excavation direction; and an auger part around which a screw is spirally wound. A method of installing round timber into ground to take liquefaction-control measures includes the steps of: opening an excavation hole on the ground without soil removal by mounting the precedent excavation rod to the pile driver; pulling the precedent excavation rod out of the excavation hole; and press-fitting round timber into the excavation hole.
申请公布号 JP2014125863(A) 申请公布日期 2014.07.07
申请号 JP20120285680 申请日期 2012.12.27
申请人 TOBISHIMA CORP;KANEMATSU NNK CORP;SHOWA MATERIAL CO LTD 发明人 NUMATA ATSUNORI;TSUTSUI MASAYUKI;MIWA SHIGERU;TAKEUCHI AKIFUMI;MIZUTANI YOSUKE;ITO TOMOE;MIMURA KAORI;KOSUGI MASAKI;IKEDA HIROAKI
分类号 E02D7/00;E02D5/26 主分类号 E02D7/00
代理机构 代理人
主权项
地址