摘要 |
<p>PROBLEM TO BE SOLVED: To provide a method for countermeasures against liquefaction of ground, which can effectively suppress differential settlement of a building.SOLUTION: A method for countermeasures against liquefaction of ground includes the steps of: digging a ditch in the ground in such a manner as to surround a building; driving first logs with a predetermined length in two rows in the ditch; connecting heads of the first logs in a length direction and a width direction by a rope; driving a second log longer than the first log inside a section surrounded by the four first logs; and backfilling soil in the ditch and compacting it.</p> |