The present invention relates to a power supplying apparatus of a phase shift full bridge (PSFB) method for controlling the switching of a leading leg switch and a lagging leg switch according to a point of time at which a direction of a primary side current changes. The apparatus comprises: a power supply unit which supplies a predetermined direct current (DC) power by switching an input power through a phase shift full bridge method; a detection unit which detects a signal waveform of a primary side current generated when switching the power of the power supply unit; and a control unit which synchronizes a point of time at which a direction of the primary side current changes with a switching operation of the power supply unit according to the signal waveform of the primary side current detected from the detection unit.
申请公布号
KR20140081494(A)
申请公布日期
2014.07.01
申请号
KR20120151306
申请日期
2012.12.21
申请人
SAMSUNG ELECTRO-MECHANICS CO., LTD.;KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGY
发明人
KIM, CHONG EUN;LEE, JEONG NAM;MOON, GUN WOO;KIM, DUK YOU;KIM, DON SIK