发明名称 |
PROCEDE D'EXPLOITATION D'UN RESERVOIR GEOLOGIQUE A PARTIR D'UN MODELE DE RESERVOIR CALE AU MOYEN D'UN PARAMETRAGE MULTI-ECHELLES |
摘要 |
The method involves constructing (MR-0) the reservoir model by providing an initial reservoir model including a grid comprising N1 mesh cells and another initial reservoir model including another grid comprising N2 mesh cells. The N2 mesh cells are greater than N1 mesh cells. The latter model is scaled to a simulation reservoir model which is usable by a flow simulator. An optimum exploitation scheme is determined (SE) for the reservoir by simulating the exploitation of the reservoir by the latter reservoir model and the flow simulator. An independent claim is included for a computer program product for downloading from one of the communication networks. |
申请公布号 |
FR2992448(B1) |
申请公布日期 |
2014.06.27 |
申请号 |
FR20120001810 |
申请日期 |
2012.06.26 |
申请人 |
IFP ENERGIES NOUVELLES |
发明人 |
LE RAVALEC MICKAELE;GARDET CAROLINE |
分类号 |
G06F17/50;E21B43/00 |
主分类号 |
G06F17/50 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|