摘要 |
<p>A process plant includes a base having a plurality of module receiving areas, each area configured to receive a supply module. At least one of the receiving areas additionally configured to receive a blender. A plurality of interconnection pipings fixedly arranged relative to the base. Each piping interconnecting each of the module receiving areas to each other; and connections on each of the interconnection pipings at each of the module receiving areas. Each connection configured to selectively connect and disconnect either a supply module or blender within a respective module receiving area from its respective interconnection piping. A method of processing a fracturing fluid is also included.</p> |