摘要 |
PROBLEM TO BE SOLVED: To shorten a construction schedule, decrease the probability of a fire accident, and suppress dew formation.SOLUTION: An air conditioner includes: an outdoor unit; an indoor unit; and a refrigerant circuit. Construction of the air conditioner includes: a planning process (M1) of determining plant constructed portions and site constructed portions for the refrigerant circuit on the basis of a building drawing of a building; a part machining process (M2) of producing a plurality of parts (42) of the refrigerant circuit (40) corresponding to the plant constructed portions determined in the planning process (M1); and an installation process (M3) of installing a plurality of devices of the refrigerant circuit corresponding to the site constructed portions determined in the planning process (M1) in a building and connecting the devices. |