发明名称 METHOD FOR EXTENDING TIME BEFORE STEAM GENERATOR OVERFLOWS UNDER ACCIDENT CONDITION
摘要 <p>A method for extending the time before a steam generator overflows under an accident condition, related to the field of pressurized water reactor nuclear plant accident response method, comprising the following steps: step one: occurrence of an accident that causes all auxiliary feedwater pumps to be activated; step two: shutdown of the auxiliary water pumps; and, step three: determination of whether or not the auxiliary feedwater pumps need to be reactivated. By adding a protection control signal, the method automatically adjusts the flow of an auxiliary feedwater supply to the steam generator, and extends the time before the steam generator overflows under the premise that reactor core safety is ensured, thus extending the time for non-intervention to the accident by an operator, and reducing operator errors.</p>
申请公布号 WO2014090107(A1) 申请公布日期 2014.06.19
申请号 WO2013CN88608 申请日期 2013.12.05
申请人 NUCLEAR POWER INSTITUTE OF CHINA 发明人 CHEN, WEI;DING, SHUHUA;LI, ZHE;JIANG, XIAOWEI;HE, XIAOQIANG;GUAN, ZHONGHUA;ZHANG, XIAOHUA;LI, ZHONGCHUN;WU, QING;HUANG, DAISHUN;ZHANG, YU;LENG, GUIJUN;LIU, CHANGWEN
分类号 G21D3/06;G21C15/18 主分类号 G21D3/06
代理机构 代理人
主权项
地址