发明名称
摘要 <p>A method for selecting between centralized and distributed maximum power point tracking in an energy generating system (500) is provided. The energy generating system (500) includes a plurality of energy generating devices (502), each of which is coupled to a corresponding local converter (504). Each local converter (504) includes a local controller (508) for the corresponding energy generating device (502). The method includes determining whether the energy generating devices (502) are operating under quasi-ideal conditions. The energy generating system (500) is placed in a centralized maximum power point tracking (CMPPT) mode when the energy generating devices (502) are operating under quasi-ideal conditions and is placed in a distributed maximum power point tracking (DMPPT) mode when the energy generating devices (502) are not operating under quasi-ideal conditions.</p>
申请公布号 JP5526333(B2) 申请公布日期 2014.06.18
申请号 JP20110509723 申请日期 2009.05.14
申请人 发明人
分类号 G05F1/67 主分类号 G05F1/67
代理机构 代理人
主权项
地址