发明名称 METHOD OF WELL OPERATION WITH HELP OF ELECTRICALLY DRIVEN BOREHOLE PUMP PLANT
摘要 FIELD: engines and pumps.SUBSTANCE: proposed method comprises reiteration of fluid evacuation from the well alternating with fluid accumulation of fluid therein at off borehole pump and adjustment of relationship between evacuation and accumulation duration depending upon well fluid dynamic level. In compliance with this invention, duration of all cycles is set equal to 40-80 minutes. Rated efficiency of borehole pump is set 3 to 5 times higher than the well producing ability. Duration of fluid evacuation at different cycles is periodically adjusted by changing of previous magnitude by 10-20% unless preset fluid level is reached.EFFECT: high-efficiency, reliable operation.3 cl
申请公布号 RU2519238(C1) 申请公布日期 2014.06.10
申请号 RU20120149264 申请日期 2012.11.19
申请人 OBSHCHESTVO S OGRANICHENNOJ OTVETSTVENNOST'JU "GAZPROMNEFT' NAUCHNO-TEKHNICHESKIJ TSENTR" (OOO "GAZPROMNEFT' NTTS") 发明人 SARAPULOV NIKOLAJ PAVLOVICH;SHUSHAKOV ALEKSANDR ANATOL'EVICH;GALEEV AMIR FARIDOVICH;SULEJMANOV AJJAR GUSEJNOVICH
分类号 E21B43/00 主分类号 E21B43/00
代理机构 代理人
主权项
地址