发明名称 Method for integrating signals transmitted from a transmitter to at least one ultra wide band (UWB) receiver as well as device for the implementation of the method
摘要 A method for integrating signals transmitted from a transmitter to at least one ultra wide band receiver, includes initializing a measurement by estimating an initial clock drift ΔDHinit between said transmitter and said at least one ultra wide band receiver, thereby generating an estimated clock drift, executing an iterative loop, wherein executing said iterative loop comprises integrating at least one received primary signal, said at least one received primary signal composed of at least two samples, wherein integrating said at least one received primary signal comprises a first integration, and at least one of a second integration and a third integration, wherein said first integration uses said estimated clock drift, said second integration uses said estimated clock drift increased by a predetermined value, and said third integration uses said estimated clock drift decreased by a predetermined value, and selecting from among said integrations an integration that maximizes a quality criterion.
申请公布号 US8750346(B2) 申请公布日期 2014.06.10
申请号 US201213437387 申请日期 2012.04.02
申请人 Commissariat à L'Ènergie Atomique et aux Ènergies Alternatives 发明人 Villien Christophe;Daniele Norbert
分类号 H04B1/30 主分类号 H04B1/30
代理机构 代理人
主权项 1. A method for integrating signals transmitted from a transmitter to at least one ultra wide band receiver, said method comprising: initializing a measurement by estimating an initial clock drift ΔDHinit between said transmitter and said at least one ultra wide band receiver, thereby generating an estimated clock drift, executing an iterative loop, wherein executing said iterative loop comprises integrating at least one received primary signal, said at least one received primary signal composed of at least two samples, wherein integrating said at least one received primary signal comprises a first integration, and at least one of a second integration and a third integration, wherein said first integration uses said estimated clock drift, said second integration uses said estimated clock drift increased by a predetermined value, and said third integration uses said estimated clock drift decreased by a predetermined value, and selecting from among said integrations an integration that maximizes a quality criterion.
地址 Paris FR
您可能感兴趣的专利