发明名称 |
Method for integrating signals transmitted from a transmitter to at least one ultra wide band (UWB) receiver as well as device for the implementation of the method |
摘要 |
A method for integrating signals transmitted from a transmitter to at least one ultra wide band receiver, includes initializing a measurement by estimating an initial clock drift ΔDHinit between said transmitter and said at least one ultra wide band receiver, thereby generating an estimated clock drift, executing an iterative loop, wherein executing said iterative loop comprises integrating at least one received primary signal, said at least one received primary signal composed of at least two samples, wherein integrating said at least one received primary signal comprises a first integration, and at least one of a second integration and a third integration, wherein said first integration uses said estimated clock drift, said second integration uses said estimated clock drift increased by a predetermined value, and said third integration uses said estimated clock drift decreased by a predetermined value, and selecting from among said integrations an integration that maximizes a quality criterion. |
申请公布号 |
US8750346(B2) |
申请公布日期 |
2014.06.10 |
申请号 |
US201213437387 |
申请日期 |
2012.04.02 |
申请人 |
Commissariat à L'Ènergie Atomique et aux Ènergies Alternatives |
发明人 |
Villien Christophe;Daniele Norbert |
分类号 |
H04B1/30 |
主分类号 |
H04B1/30 |
代理机构 |
|
代理人 |
|
主权项 |
1. A method for integrating signals transmitted from a transmitter to at least one ultra wide band receiver, said method comprising: initializing a measurement by estimating an initial clock drift ΔDHinit between said transmitter and said at least one ultra wide band receiver, thereby generating an estimated clock drift, executing an iterative loop, wherein executing said iterative loop comprises integrating at least one received primary signal, said at least one received primary signal composed of at least two samples, wherein integrating said at least one received primary signal comprises a first integration, and at least one of a second integration and a third integration, wherein said first integration uses said estimated clock drift, said second integration uses said estimated clock drift increased by a predetermined value, and said third integration uses said estimated clock drift decreased by a predetermined value, and selecting from among said integrations an integration that maximizes a quality criterion.
|
地址 |
Paris FR |