摘要 |
<p>A system and method for material handling includes a first portable conveyor for feeding material to a mobile bridge conveyor for the material to be stacked via a stacker until a discharge end of the mobile bridge conveyor is at or within a predetermined distance of a discharge end of the first portable conveyor. The first portable conveyor moves away from the mobile bridge conveyor after the discharge end of mobile bridge conveyor is at or within the predetermined distance of the discharge end of the first portable conveyor. A second portable conveyor that feeds material to the first portable conveyor rotates such that a discharge end of the second portable conveyor is moved towards the mobile bridge conveyor until reaching a feeding position for feeding material to the mobile bridge.</p> |