摘要 |
A system for degassing and transportation of bio-gas at operating disposal sites includes a well connected to gas duct and a pipe casing placed to the well, the drilled space of the well is filled with gravel. To the casing pipe one more, inner casing pipe is placed, there a metal protective screen is installed, the gas duct is connected to the gas line with gas-collection terminal, there from main gas lines go out. The gas lines are laid to the place of following utilization of biogas or production of electric energy at co-generation installations, and go to the central terminal equipped with a system for discharge of condensate and installed in the gas-collection collector. |