A system and method for controlling the movement of plural trains (102) over a rail 5 network (105), where the rail network is divided into at least one control area (100) with a dispatcher (110) assigned to manage the movement of trains in a control area by predicting the occurrence of events along the network based on the movement plan and prompting the dispatcher to provide information or take specified actions relating to the predicted events.
申请公布号
AU2011250792(B2)
申请公布日期
2014.05.22
申请号
AU20110250792
申请日期
2011.11.15
申请人
GENERAL ELECTRIC COMPANY
发明人
JULICH, PAUL M.;WILLS, MITCHELL SCOTT;PHILP, JOSEPH WESLEY;MACEO, JOANNE MARGARET;SMITH, BRIAN SCOTT;RONEY, CHRISTOPHER P.