发明名称 METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS
摘要 FIELD: mining.SUBSTANCE: proposed method comprises opening the deposits by subsurface works and layer-by-layer development of main deposits by open works. It includes reclaiming to stores of every bed in direction of the pit boards to form safety prisms nearby design outline of the latter. Remote control equipment is used at final works at every bed. Rock is carried over subsurface courses of worked bed to surface. Deposit is exposed to concentration bed mark and open working. Then, temporary exposed and subservice opening works are performed to separate the flows of overburden and minerals. Concentration bed and temporary exposed works marks are set over pit depth related with current volumes of exposure works at layer-by-layer working. Dominating volume of overburden is fed to surface via openings. Total volume of minerals is fed via subsurface openings is discharged to concentration bed site. Deposit deep overburden is dumped in pit worked-out area to make altitude marks of overburden inner terrace row comply with those of cross-heading foundation level.EFFECT: formation of integrated mining complex with parameters to allow its use both in development and after its termination.2 cl, 4 dwg
申请公布号 RU2515649(C1) 申请公布日期 2014.05.20
申请号 RU20130105043 申请日期 2013.02.06
申请人 FEDERAL'NOE GOSUDARSTVENNOE AVTONOMNOE OBRAZOVATEL'NOE UCHREZHDENIE VYSSHEGO PROFESSIONAL'NOGO OBRAZOVANIJA "SIBIRSKIJ FEDERAL'NYJ UNIVERSITET" 发明人 KOSOLAPOV ALEKSANDR INNOKENT'EVICH;PTASHNIK ALEKSANDR IGOREVICH;PTASHNIK JULIJA PAVLOVNA
分类号 E21C41/00 主分类号 E21C41/00
代理机构 代理人
主权项
地址