摘要 |
<p>PROBLEM TO BE SOLVED: To provide a highly reliable exudation water management system capable of reducing risk of leakage of exudation water, in management for disposing of the exudation water in the open type final disposal site.SOLUTION: The exudation water management system is provided for managing disposal of the exudation water in the open type final disposal site. The exudation water management system comprises a rain gauge 8 for measuring a rainfall amount in filled-up land 1 of the final disposal site, a rainfall amount calculation part 14 for calculating the rainfall amount with every predetermined time based on a measured value of the rain gauge 8, an exudation water flowmeter 11 for measuring a flow rate of the exudation water introduced to an adjustment pond 3 from the filled-up land 1, an exudation water amount calculation part 15 for calculating an amount of exudation water with every predetermined time introduced to the adjustment pond 3 based on the measured value of the exudation water flowmeter 11 and a storage part 19 for storing a calculation result by the rainfall amount calculation part 14 and the exudation water amount calculation part 15 in response to the calculation timing.</p> |