摘要 |
<p>PROBLEM TO BE SOLVED: To provide a production control system which can draft a production plan based on a current state of progress and taking into account restoration planning, in the case that a power cut or the like occurs.SOLUTION: A storage section 62 of a production control server 60 includes: process supplementary information which is review information of a work process in the event of impediment occurrence at a workspace; and facility supplementary information which is information for enabling a facility used in the work process to be in an operable state in the event of the impediment occurrence. A processing section 61 of the production control server 60, when accepting that an impediment such as a power cut has occurred, obtains information from a work result collection server 70, that is received from a tag reader disposed at the work space, and determines whether work is in progress or not on the basis of the obtained information, and when the work is in progress, executes reviewing of the work process related to an instruction 1, on the basis of the process supplementary information and the facility supplementary information.</p> |