摘要 |
PURPOSE: A tunnel boring machine (TBM) tunnel front prediction system is provided to predict an abnormal zone which is the same as a fragmental zone of faults in the front of a tunnel and to evaluate rocks in the front of the tunnel during the excavation of the TBM tunnel. CONSTITUTION: A cutter head (120) of a TBM includes a plurality of rotational disk cutters (130). An exploration device (110) measures the condition of ground in the front of a tunnel by using electrical specific-resistivity. A part of the rotational disk cutters is electrically connected with the exploration device. A part of the rotational disk cutters is electrically insulated from the cutter head. [Reference numerals] (AA) Measuring electrical resistivity; (BB) Exploring system; (CC) Anomaly; (DD) Prediction range: 4D; (EE) Performance; (FF) With the measurement of electrical resistivity; (GG) Bedrock condition evaluation (classification of bedrock ); (HH) Prediction of anomaly in front of a tunnel (size, location, state etc.) |