摘要 |
PROBLEM TO BE SOLVED: To provide a schedule system or the like capable of efficiently exhibiting processing performance belonging to a resource.SOLUTION: A schedule system 1 has a scheduler 2 for determining a specific resource for processing a task in response to a first instruction to secure a resource, the first instruction that is included in the task to be processed by a calculation processor having a many-core accelerator 5 being the resource and a processor for controlling the resource. |