A system and method for reducing an electrical load in a facility with a building automation system, includes first receiving information for a demand response event from an automated demand response server at an automated demand response client. After receipt of a new demand response event, the system determines a plurality of devices of the building automation system to be controlled during the demand response event. Next, the system prepares a schedule of control actions for the plurality of devices during the demand response event. The system then sends control messages to the building automation system to execute the control actions for the plurality of devices according to the schedule of control actions for the demand response event.
申请公布号
EP2721450(A1)
申请公布日期
2014.04.23
申请号
EP20120727568
申请日期
2012.06.08
申请人
SIEMENS INDUSTRY, INC.;SIEMENS CORPORATION
发明人
IMHOF, RAPHAEL;SONGKAKUL, PORNSAK;MARCHI, MICHAEL J.;RULE, THOMAS;HILLER, PAULA;ERSCH, FLORIAN