摘要 |
FIELD: oil and gas industry.SUBSTANCE: invention suggests procedure for survey of the multi-hole horizontal well that includes stages of bottomhole apparatus running-in to the well, performance of hydrodynamic research and removal of a geophysical tool from the multi-hole horizontal well. At that, before bottomhole apparatus running-in, at the head of the multi-hole horizontal well a hydraulic whipstock with drill out breakable cap, metering orifice and fixing breaking pin is installed at the lower end of the pipe string. The pipe string with the hydraulic whipstock is run in with simultaneous washing up to space of the surveyed side-tracking. Herewith in process of running-in the pipe string is equipped with kick-off valves. Then excess hydraulic pressure is created in the pipe string and the string is run in into the surveyed offshoot and excess pressure in the pipe string is increased till the breaking pin is destructed and the breakable cap is disconnected from the hydraulic whipstock. Then at the well head the bottomhole apparatus is connected to a rigid cable and the apparatus is run in into the pipe string until it leaves the string and appears in the offshoot. Thereafter fluid influx is stimulated from the stratum by gas injection to tubing-casing annulus through kick-off valves and hydrodynamic research is carried out in the surveyed offshoot by the bottomhole apparatus pushing up to the bottomhole. After hydrodynamic research the rigid cable with bottomhole apparatus from the pipe string and the pipe string with hydraulic whipstock are removed in sequence.EFFECT: improving accuracy and efficiency of hydrodynamic research in offshoots of the multi-hole horizontal well.2 dwg |