摘要 |
This power distribution management device (10) acquires, at predetermined intervals from a meter classified under a predetermined group, predetermined data including the amount of electric power used in a piece of load equipment of a consumer. Further, if it was not possible to acquire, within said predetermined interval, said predetermined data on the consumer's load equipment from a smart meter (50) included in said group, the power distribution management device (10) detects equipment in a power distribution system associated with said group as an abnormal part. |