发明名称 Construction Management System and Method thereof
摘要 According to a construction management system in which a database part for storing information, a management server for integrated construction management, an ordering body computer, a designer computer, and a specialized construction business operator computer are connected through a communication network, the management server includes: a construction planning management part, a design management part, a bidding and contract management part, a construction management part, and an after-construction management part; a project management part, a schedule management part, a cost management part, a quality management part, and a construction information management part belonging to the respective management parts; an ordering body providing part for providing an ordering body computer with all processes from construction planning to construction completion to share with the ordering body; a designer providing part for sharing all processes from construction planning to construction quality management with a designer; and a specialized construction business operator providing part enabling a specialized construction operator in charge of construction per process to check construction schedule etc or to input construction situation etc. A database part is connected to the management server or is included in the management server. [Reference numerals] (101,301,401) Construction general plan and management part;(102,302,402) Construction council management part;(103,303,403) Design general management part;(104,304,404,502) Construction schedule management part;(105,305,405) Construction cost management part;(106) Bidding management part per work classification;(107,306) Contract management part per work classification;(108,307,406) Building management part per work classification;(109,308,407) Quality management part;(110) After-construction management part;(111,309,408) Information sharing management part;(112) Ordering body management part;(113) Designer management part;(114) Specialized construction business operator management part;(201) Construction business management DB;(202) Designer DB;(203) Specialized construction DB;(501) Bidding management part;(503) Building management part
申请公布号 KR101365165(B1) 申请公布日期 2014.04.03
申请号 KR20110141054 申请日期 2011.12.23
申请人 发明人
分类号 G06Q50/08 主分类号 G06Q50/08
代理机构 代理人
主权项
地址