摘要 |
PROBLEM TO BE SOLVED: To obtain a structure design device of a building capable of improving a work efficiency of the design and proposing a building suitable for the strength of a base junction part.SOLUTION: A value (Q) maximizing the data from a database 72 in which the data of the strength of a base junction part installed corresponding to each basic design plan is accumulated is set as the strength of a base junction part 60 of a building 10. In this manner, a shape of a base 40 can be previously determined by setting the strength of the base junction part 60 irrespective of the basic design plan of the building 10. As a result, the shape (specification) of the base 40 can be limited to one type for the plurality of basic design plans. That is, the shape of the base 40 is not changed regardless of which basic design plan is selected. Thus, irrespective of the basic plan of the building 10, a length of the anchor bolt 54 which joins a building body 14 and the base 40 can be unified, and the cost thereof can be reduced by a massive order. |