发明名称 BLAST FURNACE INSTALLATION
摘要 This blast furnace installation (100) is configured such that when pulverized coal (18), which has been prepared by pulverizing high-grade coal (12) supplied by a feeder (152) to a roller mill (153), is pneumatically conveyed into a supply tank (120) by means of a combustion gas (108), pulverized coal (8), which has been prepared by drying, dry-distilling, cooling, and pulverizing low-grade coal (2) with a drying device (122), a dry-distillation device (123), a cooling device (124), and a pulverization device (125), is supplied from a storage tank (126) by a feeder (127) and pneumatically conveyed into the supply tank (120) by means of a nitrogen gas (102), and then the pulverized coals (8, 18) in the supply tank are pneumatically conveyed from a supply line (119) into an injection lance (116) by means of a carrier gas (107), a control unit (160) controls the feeders so as to gradually increase the supply amount (C2) of pulverized coal (8) while maintaining the total amount of supply amount (C1) of pulverized coal (18) and supply amount (C2) of pulverized coal (18) to be supplied to the tuyere at a prescribed amount (Ct).
申请公布号 WO2014045877(A1) 申请公布日期 2014.03.27
申请号 WO2013JP73879 申请日期 2013.09.05
申请人 MITSUBISHI HEAVY INDUSTRIES, LTD. 发明人 NAKAGAWA, KEIICHI;OMOTO, SETSUO;SAKAGUCHI, MASAKAZU;HAMADA, TSUTOMU;OKADA, TAKESHI
分类号 C21B7/00;B02C21/00;C21B5/00 主分类号 C21B7/00
代理机构 代理人
主权项
地址
您可能感兴趣的专利