摘要 |
A process to track at least one container (1a, 1b), which is loaded at the unloading area of harbor terminal (2) by container crane (5a) located there onto at least one trailer (8a, 8b) of vehicle (3), which is moved to placement position (6), and which is unloaded there by a second container crane (5b) to storage position (15), where the position of the loaded or unloaded container (1a, 1b) on one of the trailers (8a, 8b, 9a, 9b) of vehicle (3) is determined by a measurement of the distance (13, 13a, 13b) between vehicle (3) and container crane (5a, 5b). |