发明名称 Kannenwechselvorrichtung fuer Spinnereivorbereitungsmaschinen
摘要 972,409. Conveyers; rail systems. DEUTSCHER SPINNEREIMASCHINENBAU INGOLSTADT NIEDERLASSUNG DER SCHUBERT & SALZER MASCHINENFABRIK A.G. Feb. 11, 1963 [Feb. 9, 1962; Dec. 14, 1962], No. 5517/63. Heading B7L. [Also in Divisions B8 and D1] A trolley from which empty cans are unloaded into a sliver depositing device (see Division D1) or on to which filled cans are loaded is hitched to a cable or a rack-and-pinion device for movement between two positions so that the unloading or loading can be completed. In Fig. 7 a hitch 44 is riveted to a cable 31 and comprises a guide 41 which can run on a rail 40, and a projection 45 mounted on plate 42 supported by a block 43. By means of a bolt 50 attached to the trolley the latter can be moved in the direction P 3 when the cable is moved. In another construction (Fig. 13) trolleys 7 and 8 are held by pins in holes 82 in catches 80 forming part of a hitch 51. The hitch which has a rack 64 geared to a motor 65 (Fig. 11, not shown), has wheels 74 running on the base of girders 75 and guide runners 73 on the edges of the girders. The trolleys are pushed away by springs 83 when a lever 76 releases the catches 80.
申请公布号 DE1266672(B) 申请公布日期 1968.04.18
申请号 DE1962D038105 申请日期 1962.02.09
申请人 DEUTSCHER SPINNEREIMASCHINENBAU INGOLSTADT NIEDERLASSUNG DER SCHUBERT & SALZER MASCHI 发明人
分类号 B65H67/04 主分类号 B65H67/04
代理机构 代理人
主权项
地址