摘要 |
Load shedding by an electric utility, including querying power distribution systems that include a DRG system for present power consumption of the local load of the power distribution system; selecting, in dependence upon the present power consumption of the local load of the power distribution systems and predefined power consumption criteria for each substation, a substation to receive a reduction in power; and reducing power provided to the selected substation. |