摘要 |
The method for loading metal rods or bars (2) comprises prearranging a preloading structure (20) associated with a stock magazine (3) for feeding an apparatus for processing said metal rods or bars. Then the method comprises operating means (30) to transfer and position a specific number of rods in bundles on the above-mentioned preloading structure (20), in particular the bundles of rods required for the production cycle in progress. The bundles arranged on the preloading structure (20) are then loaded on the stock magazine (3) of the apparatus for processing the bars (2). |