摘要 |
The present invention relates to a 3D construction work management apparatus. The management apparatus according to the present invention easily manages a construction field by three-dimensionally grasping whether a construction work is successively performed at the construction filed. The 3D construction work management apparatus according to the present invention intuitively displays construction related information by connecting the construction related information including detailed construction name information, detailed construction schedule information, construction material information, and detailed construction specification information for a 3D construction structure to the corresponding construction structure. |