发明名称 Method for the blast furnace loading
摘要 A method for the blast furnace loading includes supplying ore component to the furnace, which is divided into two portions with the size of 30-70% of its total weight in the skip and placing between these portions of the nut coke with a particle size of 8- and metallurgical coke. Some nut coke with a particle size of 8-15 (20) mm is loaded in such quantity that this nut is enough for the fully direct iron reduction up to 30%, and some nut coke of the larger fraction [16 (21) - 40 mm]. Part of metallurgical coke is loaded in the quantity of not more than 25% of the total weight of coke in the supply, at that all nut coke [fraction of 8-15 (20) mm and fraction of 16 (21) - 40 mm] and of part of the metallurgical coke are charged in the mixture into one skip during each loading.
申请公布号 UA88279(U) 申请公布日期 2014.03.11
申请号 UA20130011208U 申请日期 2013.09.20
申请人 "DONETSKSTAL-METALLURGICAL PLANT" CLOSED JOINT-STOCK COMPANY 发明人 YEMCHENKO ANDRII VALENTYNOVYCH;KRIKUNOV BORYS PETROVICH;YAROSHEVSKYI STANISLAV LVOVYCH;POPOV VALERII YEVHENIIOVYCH;KRYVYTSKYI DMYTRO VOLODYMYROVYCH;IVLEV VALERII PAVLOVYCH;KHAPONIN MYKOLA SEMENOVYCH;TSUKANOV VLADYSLAV IVANOVYCH;KUZIN ANDRII VIKTOROVYCH
分类号 主分类号
代理机构 代理人
主权项
地址