Method for constructing face slab of concrete face rockfill dam using rail integrated side form |
摘要 |
PURPOSE: A construction method using a rail integrated side form of a cut-off wall of a concrete surface cut-off wall type rockfill dam is provided to improve waterproofing performance by placing concrete when a PVC cut-off plate is mounted. CONSTITUTION: A rail integrated side form(230) integrating a rail guiding a slip form with a side form is installed. The slip form moving on the rail integrated side form is used in order to place concrete on a cut-off wall. The rail integrated side form includes a groove on the side surface so that a part of a PVC cut-off plate is mounted. The exposed PVC cut-off plate is embedded when the concrete is placed. |
申请公布号 |
KR101368913(B1) |
申请公布日期 |
2014.02.28 |
申请号 |
KR20110123987 |
申请日期 |
2011.11.25 |
申请人 |
|
发明人 |
|
分类号 |
E02B7/00;E02B7/06;E04G11/20 |
主分类号 |
E02B7/00 |