发明名称 METHOD AND SYSTEM FOR WELL AND RESERVOIR MANAGEMENT IN OPEN HOLE COMPLETIONS AS WELL AS METHOD AND SYSTEM FOR PRODUCING CRUDE OIL
摘要 According to the method for well and reservoir management in open hole completions, a data acquisition module (100) is advanced through the weilbore and acquires data providing information revealing fractures in the wall of the weilbore, and at least one blocking system (1002, 3000), on the basis of the data acquired, is placed in the weilbore (199, 2199, 3006) at the location of a fracture in the wall. The data acquisition module (100) is advanced by interaction with a fluid present in the weilbore, and the data acquisition module acquires data providing information on its own position in relation to the wall (3005) of the weilbore (199, 2199, 3006) and is controlled on the basis of said data in order to maintain a distance to the wall of the weilbore during its advancement. A system for well and reservoir management in open hole completions is further disclosed.
申请公布号 US2014054031(A1) 申请公布日期 2014.02.27
申请号 US201214002918 申请日期 2012.02.14
申请人 HEIJNEN WILHELMUS HUBERTUS PAULUS MARIA;PETERS ROBERT BOUKE;BRINK DAVID IAN;MAERSK OLIE OG GAS A/S 发明人 HEIJNEN WILHELMUS HUBERTUS PAULUS MARIA;PETERS ROBERT BOUKE;BRINK DAVID IAN
分类号 E21B47/10;E21B23/06;E21B23/14;E21B33/126 主分类号 E21B47/10
代理机构 代理人
主权项
地址