摘要 |
PROBLEM TO BE SOLVED: To provide a shore structure as countermeasure against tsunami, which significantly attenuates the energy of tsunami before the tsunami surges across the land, prevents the influence of the surging tsunami on a breakwater to the utmost extent, reduces the top edge height of a breakwater, ensures visibility or dwelling environment, and allows for rapid construction with reduced material cost. SOLUTION: A shore structure includes a concave groove part 20 bored under the ground surface along a shore 13 so as to drop tsunami to the inside, and a raising part 30 which is formed at least at the edge on the sea side of the concave groove part 20 so as to raise the drop height of tsunami. COPYRIGHT: (C)2013,JPO&INPIT |