摘要 |
A tendon is assembled in a horizontal orientation using connectors or by welding at a weld station on a barge or other vessel located at or near the installation site of a tension leg platform. During assembly, the tendon is pulled away from the assembly vessel and tensioned by a tug or offshore work vessel. When fully assembled, the tendon may be up-ended in a manner similar to a wet-towed tendon, and then either pre-installed using floats or passed over to a TLP which is on-site and ready to receive tendons. |