发明名称
摘要 PROBLEM TO BE SOLVED: To provide a structure building method in a hollow space of a building having a hollow space in a simple procedure; and to provide a tool used for the method. SOLUTION: Instead of a conventional method of building a structure for building a structure in a hollow space of a building, the following processes are alternately repeated to assemble building materials sequentially from a lower layer to an upper layer and complete the structure: a process in which two steel grounding suspension beams fixed striding over the hollow space, a cargo handling traction rope, and a hoisting mechanism are provided, a structure scheduled to complete is temporarily divided into a plurality of layers in the height direction, and when the height of a building in the course of building exceeds a predetermined height of layers, both ends of at least two steel grounding suspension beams made horizontal striding over the hollow space are fixed to a specific building beam at the predetermined height of the layers; and a process in which the cargo handling traction rope is wound up or wound down by the hoisting mechanism, a hoisting metal tool is taken as a hoisting point, and the building materials of the hoisted structure are assembled to build part corresponding to a predetermined layer of the structure. COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP5410322(B2) 申请公布日期 2014.02.05
申请号 JP20100028303 申请日期 2010.02.11
申请人 发明人
分类号 E04B1/35;E04G3/30;E04G21/14 主分类号 E04B1/35
代理机构 代理人
主权项
地址