摘要 |
To realize a reduction in the number of days and man-hours and improve the quality during the transition of information systems from a current system to a new system; the present invention enables an efficient old and new verification test, a load test, and the likes and assists the transition. A test transition assistance system comprises the steps of: acquiring a request message and a response message from a current system by a packet capture; applying a process such as adding an identifier and an acquisition time to store message information in a storage; reading the stored message information, in non-real time, to apply processes such as conversion of the message corresponding to a new system, or adjustment of time to control the number of request message transmissions per load and per unit time; transmitting a request message to the new system; receiving a response message; and comparing the old and new response messages or response times, as well as a plurality of message relationships and orders. [Reference numerals] (110) Test transition assistance system; (111) Message acquisition function; (112) Message process and storage function; (113) Message read and process function; (114) Message transmission and reception function; (115) Message comparison function; (120) New system A'; (130) Current system B; (140) Current system A; (150) Network; (AA) Control and calculation unit; (BB) Input unit; (CC) Storage unit; (DD) Output unit |