发明名称 TRAIN OPERATION COMMAND DEVICE
摘要 PROBLEM TO BE SOLVED: To eliminate contradiction in train schedule diagram on the basis of an intuitive operation by manipulating a predicted diagram line.SOLUTION: A train operation command device (1), incorporated in a train operation management system for performing an automatic course setup in accordance with a pre-generated planned diagram, performs: screen-displaying, on a display (20) of the train operation command device (1), a planned diagram line based on the planned schedule diagram, an actual diagram line representing the actual operation, and a predicted diagram line produced by predicting the future operation prediction on the basis of the actual operation; displaying a symbol at a spot indicating an arrival-departure clock time on the displayed predicted diagram line, a track number and the like, the symbol allowing a pointing device to drag; receiving a command of a schedule diagram change content by dragging the symbol; and displaying, on the display (20), a predicted diagram line predicted regardless of presence of a contradiction in train schedule diagram on the basis of a planned diagram line based on the changed schedule diagram due to the command content, the actual diagram line, and the changed planned schedule diagram.
申请公布号 JP2014019182(A) 申请公布日期 2014.02.03
申请号 JP20120156347 申请日期 2012.07.12
申请人 HITACHI LTD 发明人 KUDO MASANORI
分类号 B61L27/00 主分类号 B61L27/00
代理机构 代理人
主权项
地址