摘要 |
<p>FIELD: oil-and-gas industry.SUBSTANCE: casing is sunk into well to perforate the bed. Oil and water saturation intervals and impermeable seam sizes are analysed. Casing part is cut out to expand the borehole in said interval. Fluid is injected in string for packer to define the bed specific capacity. Fluid circulation is defined by injecting fluid via casing string-borehole annulus. In case circulation exists, isolation composition is injected to produce isolation bridge inside casing string 20-30 m above perforation interval. In case circulation does not exist, isolation composition is discharged via casing string-borehole annulus to interval of perforation of oil-and water saturated bed zone to fill expanded bore expanded interval with isolation composition. After hardening of isolation composition, isolation composition is drilled to produce the shield opposite said saturated zone. Isolation quality is analysed. Bed perforation is repeated to resume its development.EFFECT: lower labour input, accelerated process, higher isolation quality.7 dwg</p> |