发明名称 CONSTRUCTION METHOD OF ADDITIONAL SHAFT IN WELL
摘要 FIELD: mining.SUBSTANCE: at implementation of the method, the main shaft is drilled and fixed till design depth; after that, the shaft is enlarged by cutting-out a casing string interval of the main shaft so that upper and lower parts of the main shaft are obtained. Enlargement interval is cemented; cement is drilled at enlargement interval with creation of interaction of the upper and lower parts of the main shaft with simultaneous enlargement of the diameter exceeding inner diameter of the casing string by wall thickness of long element of the support plate. An additional shaft is drilled and a removable diverting wedge is installed. The diverting wedge is removed prior to lowering of the support plate that is oriented during lowering to the well as per geophysical instruments, installed and rigidly fixed by enlargement so that a side branch of the support plate can be arranged in the additional shaft.EFFECT: possibility of performing construction of additional shafts out of wells cased with a production string so that flow passage of the main shaft is maintained without considerable reduction of diameter of the additional shaft.6 dwg
申请公布号 RU2504636(C1) 申请公布日期 2014.01.20
申请号 RU20120132394 申请日期 2012.07.27
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IMENI V.D. SHASHINA 发明人 KHISAMOV RAIS SALIKHOVICH;NURIEV IL'JAS AKHMATGALIEVICH;AKHMADISHIN FARIT FOATOVICH;MUKHAMETSHIN ALMAZ ADGAMOVICH;ILALOV RUSTAM KHISAMOVICH
分类号 E21B7/08;E21B43/10 主分类号 E21B7/08
代理机构 代理人
主权项
地址