摘要 |
PROBLEM TO BE SOLVED: To provide the temporary placement structure of a mold form for aboveground tank construction for temporarily placing a mold form without moving it as much as possible and the construction method of the aboveground tank.SOLUTION: A temporary placement section for temporarily placing a mold form is installed on the peripheral surface of an existing side wall. After the temporary placement section is installed on the peripheral surface of the existing side wall, a new side wall is constructed above the existing side wall, and the mold form removed from the new side wall is temporarily placed on the temporary placement section. Those processes are successively repeated to construct the side wall portion of an aboveground tank. |