发明名称 METHOD FOR INTER-WELL FLUID PUMPING
摘要 FIELD: oil and gas industry.SUBSTANCE: method includes packer installation above the production well bed, oil-water emulsion extraction from below-packer space by pump, descended at tube string, emulsion separation to oil and water in down-hole conditions, oil extraction from top part of above-packer annular space to oil pipeline, extraction of formation water and its pumping via water pipeline through injection wells into oil bed with undeveloped oil resources. Pump operation is provided in constant mode, oil-water emulsion is supplied through radial holes in tube string into above-packer annular space, where oil-water emulsion is separated. Water is extracted from above-packer annular space via subsidiary tube, the inlet of which is located below the level of water-oil contact, and its outlet is connected to the water pipeline fitted with flow metre. Oil extraction is additionally performed from tube string into oil pipeline, which is fitted with flow regulator and is connected to the subsidiary tube via bypass line, connected to the oil pipeline after flow regulator for water discharging into it at water pipeline repair works.EFFECT: extension of scope of application due to the use of former production wells as well as actual watered production wells as water supply wells; efficiency increase due to elimination of pump station stops for pump station switching to oil displacement mode and for the time of water pipeline repair works.1 ex, 1 dwg
申请公布号 RU2503805(C1) 申请公布日期 2014.01.10
申请号 RU20120132514 申请日期 2012.07.27
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IMENI V.D. SHASHINA 发明人 RAKHMANOV AJRAT RAFKATOVICH;AKHMADIEV RAVIL' NUROVICH;KALIMULLIN RUSTAM TALGATOVICH;VALOVSKIJ KONSTANTIN VLADIMIROVICH;BASOS GEORGIJ JUR'EVICH;VALOVSKIJ VLADIMIR MIKHAJLOVICH
分类号 E21B43/20;E21B43/12 主分类号 E21B43/20
代理机构 代理人
主权项
地址